Office Fit-Out Warehouse Fit-Out Portfolio Case Studies Blog Build Your BOQ 💬 WhatsApp Free Pre-Lease Audit →
Office fit-out contractor Bengaluru
Warehouse fit-out contractor Bengaluru
Office Fit-Out Contractor
Warehouse Fit-Out Contractor

Office & Warehouse
Fit-Out Contractors.

Bengaluru's infrastructure-first office fit-out and warehouse fit-out contractor. Civil, MEP, HVAC, cabling, CCTV, fire safety — one contract, one team, Day-1 operational. Track every activity and approval live — no surprises.

75K+
Sq Ft Built
Zero
Rework Cost
Day 1
Operational
1 Team
All Trades
Live
Project Tracking
Scroll
75K+
Sq Ft Delivered
14+
Case Studies
16
Active Locations
₹0
Rework Cost

Trusted by companies across Bengaluru

Ingram Micro
Wheelhub
Cult Fitness
Stance Health
Edizi
Optra Care
5pounds
Aster
Blinkit
Commando Hospital
Drdo
HCG
Kendria Vidyalaya
MedPlus
Raja Housing
Suchirayu
Valo Space
Ingram Micro
Wheelhub
Cult Fitness
Stance Health
Edizi
Optra Care
5pounds
Aster
Blinkit
Commando Hospital
Drdo
HCG
Kendria Vidyalaya
MedPlus
Raja Housing
Suchirayu
Valo Space
Who We Build For

Turnkey office fit-out. Warehouse fit-out.
One contract. GCC, corporate & enterprise.

Whether you just closed a funding round and need an office fit-out in 45 days, or you're setting up a 50,000 sq ft warehouse — we've done both, and we'll do yours right.

🏭 Warehouse Fit-Out Contractor
Warehouse infrastructure at scale. On time.

LT panels, cable trays, high-bay LED, networking, CCTV, fire detection, industrial HVAC — planned right, installed clean, commissioned on handover. From Dobbaspet to Bommasandra, RC Workspace delivers large-format warehouse fit-out across Bengaluru's industrial corridors.

Logistics & Distribution Manufacturing Cold Storage Industrial MEP
Warehouse fit-out areas in Bengaluru →
❄️
HVAC & Mechanical
Right-sized cooling planned before layout — so you never rip open a ceiling to fix it later. Part of every office and warehouse fit-out contract.
Turnkey Commercial MEP Infrastructure Engineering
Safe, scalable power infrastructure — from a startup office to a 1 lakh sq ft warehouse floor. BESCOM coordination included.
🌐
Enterprise Data Backbone & Network Infrastructure
Cat6/Cat6A structured cabling to every desk, server room, and AP. Fluke DSX certified. Delivered as part of your fit-out contract.
🔒
Integrated Access Control & Enterprise Surveillance Systems
IP camera grid, NVR, access control, ANPR — zero blind spots. Designed and installed as part of every office and warehouse fit-out.
🔥
Industrial Fire Safety Compliance & Mechanical Integration
Fire detection, sprinklers, hydrants — NBC 2016 compliant. Karnataka Fire Department NOC coordination included.
🪟
Civil & Interiors
Glass partitions, false ceiling, flooring, joinery, painting — built on infrastructure planned first. No rework, no surprises.
Why RC Workspace

Bengaluru's most transparent
turnkey office & warehouse fit-out contractor.

Most fit-out contractors go quiet after the deposit. We give you a live dashboard — every photo, approval, milestone, and payment visible in real time. Every office fit-out and warehouse fit-out project, from day one.

01
One team. All trades.

Electrical, HVAC, networking, CCTV, civil, interiors — all RC Workspace. No subcontractor chaos. One number, from site audit to handover.

● Zero coordination gaps
02
MEP before the layout.

Power, ducts, data cables finalised before the ceiling closes. Your office or warehouse will never need to be torn open after possession.

● Zero layout surprises
03
What you approve is what you pay.

Full itemised BOQ shared before work starts — every line, every rate. No hidden extras, no end-of-project variations.

● Complete BOQ. No variations.
04
Enterprise client portal.
Included free.

Private project URL, not a WhatsApp group. Daily photos, OTP drawing approvals, payment milestones, instant email updates. Real-time visibility — the same level enterprise companies demand. No other office or warehouse fit-out contractor in Bengaluru offers this.

● Daily site photos
● OTP approvals
● Payment milestones
● Instant email updates
See full portal details →
🔒 rcworkspace.company/projects/ingram-dobbaspet
RC Workspace Enterprise Client Portal
Live portal · Ingram Micro, Dobbaspet Warehouse Fit-Out
05
Day-1 operational.

Every system commissioned and tested before handover. Your team walks in and works from Day 1 — office or warehouse.

● Plug-and-play handover
06
Fast mobilisation.

45-day office fit-out delivery track record. Single contact from pre-lease audit to handover. We understand urgency.

● 45-day delivery record
Exclusive to RC Workspace Clients

Your fit-out contractor shouldn't go silent
after you pay the advance.

Most office and warehouse fit-out clients spend weeks chasing updates on WhatsApp. RC Workspace gives every client a live project portal — the same level of visibility that enterprise companies demand, included as standard.

❌ Without RC Workspace
  • "Sir work is going on" — the only update you get
  • No idea if materials have arrived on site
  • Approvals happen over WhatsApp, no record
  • You find out about delays after they happen
  • Payment disputes with no documentation
✅ With RC Workspace Portal
  • Daily photos uploaded before you even ask
  • Live progress bar — exact % complete, updated daily
  • Approve drawings from your phone in 10 seconds
  • Instant email when milestones are hit or activity is logged
  • Pay only after verified milestone completion
120+
Photos uploaded per project on average
100%
Approval history retained — forever
Daily
Progress updates during execution
₹0
Extra cost — included with every project
rcworkspace.company/projects/ingram-dobbaspet
● Live
RC Workspace Client Portal Overview
Live portal — Ingram Micro, Dobbaspet Warehouse Fit-Out
🔒 Real portal data
Get Your Own Portal → See Full Details →
Included with every RC Workspace project · No extra cost · Active from Day 1
Where We Work

All of Bengaluru.
Office & warehouse fit-out.

Office fit-out across Bengaluru's tech corridors. Warehouse fit-out across Bengaluru's entire industrial belt — Peenya to Malur, Dobbaspet to Hosur Road.

Koramangala HSR Layout Whitefield Indiranagar HQJayanagar Hebbal Electronic City MG Road Peenya Dobbaspet Bommasandra Malur Hoskote Nelamangala Bidadi Harohalli Hosur Rd Office Fit-Out Warehouse Fit-Out
Bengaluru Office & Warehouse Fit-Out Coverage
The Team Behind Every Project

Built by people who
have been on site.

We are not a design studio that subcontracts execution. Every office fit-out and warehouse fit-out is run by people who understand MEP, civil, and on-site delivery — not just aesthetics.

V
Vivek
Founder & Director

End-to-end accountability — from pre-lease infrastructure audit to Day-1 handover. Single point of contact for every client from start to finish.

Client RelationsBusiness DevelopmentTech & Systems
M
Mohnish
Co-Founder & Execution Director

On-site every day. Leads all trade coordination — electrical, HVAC, civil, interiors — ensuring zero gaps and on-time delivery across every office and warehouse fit-out project.

Site ExecutionMEP CoordinationTrade Management
RC
Our Process
Infrastructure First. Always.

Power, cooling and data are planned before the layout is drawn. This eliminates rework — the biggest hidden cost in any office or warehouse fit-out project.

MEP FirstZero ReworkDay-1 Delivery
Get In Touch

Tell us about
your space.

Whether you've just signed a lease or are still shortlisting — bring us in early. A free pre-lease infrastructure audit before you sign saves weeks of rework and lakhs in variation costs. No obligation, no hard sell.

Free Pre-Lease Infrastructure Audit — No Obligation

Mon–Sat 9am–6pm · No spam · No unsolicited follow-ups

✅ Enquiry received! We'll call you back within 2 hours during business hours.
What Clients Say

Trusted by office and warehouse teams
across Bengaluru.

★★★★★

"The portal was the biggest surprise. We could see daily photos, approve drawings on our phone, and track payments — all without making a single call. No other fit-out contractor we have worked with has offered this."

IM
Operations Head
Ingram Micro · Dobbaspet Warehouse Fit-Out
★★★★★

"We were a recently funded startup and needed an office fit-out in 45 days. RC Workspace hit the deadline, stayed within budget, and the portal kept our team informed throughout. Highly recommend."

WH
Co-Founder
Wheelhub · Office Fit-Out, Bengaluru
★★★★★

"What impressed us most was the MEP planning before the false ceiling went up. Zero rework. Day-1 operational. Exactly what was promised — and the portal made the whole office fit-out process completely transparent."

SH
Facility Manager
Stance Health · JP Nagar Office Fit-Out

75K+ Sq Ft · 14+ Projects · Bengaluru

See our office & warehouse
fit-out projects

View Portfolio → Case Studies →

Planning an office or warehouse fit-out?

Get a free pre-lease infrastructure audit before you sign. We identify power, HVAC, cabling, and fire safety issues — and deliver a detailed report within 48 hours.