HomeWarehouse Fit-Out BengaluruMalur
Warehouse Fit-Out · Malur · Malur KIADB — NH75 East Corridor

Warehouse Fit-Out Contractor in Malur, Bengaluru

Malur in Kolar district is an emerging industrial zone east of Bengaluru — attracting large-format manufacturing and warehousing from companies seeking alternatives to the more congested Peenya and Bommasandra corridors. Malur KIADB offers large plot sizes and road connectivity via NH75 and the proposed Peripheral Ring Road.

75K+
Sq Ft Delivered
₹0
Rework Cost
Day 1
Operational
1 Team
All Trades
Free Pre-Lease Infrastructure Audit WhatsApp Now

Why Warehouses in Malur Need Special Planning

Every industrial zone in Bengaluru has specific infrastructure characteristics. Here is what we plan for in Malur:

Our free Pre-Lease Infrastructure Audit identifies these issues before you sign the lease — so your BOQ is accurate from the start.

What We Deliver in Malur Warehouses

Electrical Infrastructure

LT panel, DB boards, cable trays, power distribution to all zones. BESCOM/ESCOM coordination. Sized for current load plus 40% expansion.

High-Bay LED Lighting

LED high-bay fixtures designed to IS 3646 — 200+ lux at floor level in pick zones. Emergency backup on critical circuits. Motion sensor control.

CCTV & Security

IP cameras with zero blind spots, ANPR at gates, NVR with 30-day retention, remote access for security teams.

Fire Safety

Smoke/heat detectors, addressable fire panel, sprinklers, hydrant system, fire NOC coordination with Karnataka Fire Department.

Network & Data

Structured Cat6/Cat6A cabling to office pods, Wi-Fi across warehouse floor for handheld scanners, server room rack, WAN entry.

Office Pod Fit-Out

Reception, admin workstations, server room, toilets — fully fit-out within the warehouse, under the same contract.

Project Reference

Case Study

Ingram Micro Dobbaspet

Complete infrastructure fit-out for major distribution warehouse — demonstrates our large-format capability.

View Full Case Study →
Related Resource

Warehouse Infrastructure Audit Guide

40-point checklist before signing a warehouse lease in any Bengaluru industrial zone.

Read More →

See all projects: Case Studies →  ·  Portfolio →

Services for Malur Warehouses

Warehouse Planning Guides

Other Warehouse Areas in Bengaluru

Planning a Warehouse Fit-Out in Malur?

RC Workspace offers a free pre-lease infrastructure audit — we assess your warehouse's power supply, CCTV coverage, fire system, and HVAC before you sign. BOQ delivered within 48 hours.

Book Free Pre-Lease Infrastructure Audit Contact Us